Thursday, January 11, 2018

ISLAMORADA

 Saturday, January 6, we came to Islamorada in the Keys to work at Matecumbe UMC
 Our rigs are parked between the church and the fellowship building. Route 1 is right behind us and there is nonstop traffic all day and night. A little noisy for sleeping. 
 The Fellowship hall. They have a stained glass mission and have classes here on Tuesdays and Thursdays.
 A tree fell on this corner of the roof
 and it needs to be repaired.
 Down the street towards the ocean is the parsonage. It flooded with four feet of water running through it. Some friends, family and church members have been working on it, and we will be giving a helping hand.
 This is our team, Mark and Debbie, our leaders Mary and Barry, and Larry and Dottie.  This is where we have our morning devotions and lunch.
 Monday morning we all went to work on the fellowship roof. It has been leaking so we are going to take the roofing off and re roof it.
 Mary, Debbie and I were given the job of taking the roofing screws out.
 Mark and Larry worked on fixing the side of the roof the had been damaged.
 Even with Barry's help we didn't make much progress getting the screws out of the roof on Monday. Monday afternoon Barry got the official news that we needed a permit to do the roofing so we stopped working.
 Larry and Mark were allowed to fix the damage. So the cut out out the damaged wood and replaced a section to make the repair.
 Fixed the side.
 Found a piece of roofing to replace the damaged piece.
 By Wednesday the damaged roof was looking good.
 The girls went over to the parsonage, since we couldn't continue working on the roof. Debbie and Mary grouted the tile in this room and I washed it off.
 Then on Tuesday and Wednesday we painted most of the ceilings. Of course they needed two coats. It is a big house for the Keys with four bedrooms and a large living room.
 They have been giving us lunch everyday. On Tuesday we shared a luncheon for the group who does the lovely stained glass work.
 It was nice talking to the locals and hearing their stories.
 Thursday we didn't have the permit in our hands yet but it was close enough that we could finish taking the roofing off.
 Barry had gotten a tool that took it off  without having to take each roofing screw out by hand, still hot hard work.
 Mark and Larry took out the rotten boards.
 By the end of the day on Thursday the roofing is off and this section of the roof repaired.
 We walked over to Lor-e-lie  for dinner
 and  watched the sunset. A nice relaxing way to celebrate a week of hard work.

Friday, November 3, 2017

FINISHING UP

 We worked on unit 35 on Monday. Steve, another volunteer from church, came and power washed  the house and the driveway. Betsy and I painted the house and at the end of the day Gary and Paul came over and lent a hand with painting.
Larry helped to  install new window in unit 37.
 Yes, Gary you need to demolish this bathroom.

Don and Lou gave a hand.
 Tub out and walls down to the studs.
 Oh no the bathroom behind it wasn't to be done, but the tile and the drywall cracked since the walls of the bathrooms were against each other. So another room to renovate.
 Gary and Don made a trip to the dumpster to put in the debris from the bathrooms
 Larry helped Lane ( an maintenance employee) to remove all the water, sewer and electric lines behind another building they are renovating.
Thursday we finished up the painting at the homes we painted. Carol brought another member from out church, Theresa, to help.  They painted the window sills green at unit 35.
 Larry painted the shutters for 57 and 58.
 Danny helped and then gave me a hand painting the white around the screen porches on the back of 57 and 58.
 Larry hung the shutters. By the end of Thursday we had this house completely painted inside and out.
 Betsy and I vacuumed  the windows of all the little pieces that were left from when the windows were installed in unit 37.

 A group of  11 men from PA had come for a week to volunteer.  They left on Wednesday so Betsy and I cleaned their rooms. Betsy cleaned the bathrooms and I washed all the sheets and towels.  There are very nice rooms for the volunteers to stay in.
 This was our break room, every morning they had a little treat for us.
 Tuesday Les and Maryann had us to their home for a delicious lunch. Jack and Bunny are their neighbors and they joined us. They all are retired missionaries from inland Africa. This a house the SOWERS built a few years ago. Les is at the end of the table and his wife is on his right. Bunny is next with Jack next to me. It was nice getting to know them a little more. Jack sings in the choir and  leads a Sunday school class at our church.
 Thursday evening we ended our project with a meal at an Italian restaurant. Larry, Gary, Danny, Lou, Elaine, Jacque and Betsy.
Our church volunteers, Steve, Paul , Don and their wives. It was a different project and we were blessed with all the volunteers from the church, The African Inland Mission retirement center wouldn't be able to be maintained without many volunteers.  They are already asking when they can have NOMADS return.

Friday, October 27, 2017

BACK TO WORK

 Larry was feeling much better by Monday and our team was back to work.
 Gary painted the front and back door while Lou painted the wall in the back porches.
 Danny painted  around the windows.
 Paul touched up some spots on the ceiling we had hit with the wall paint.
 Larry power washed the back of the house.
 We didn't even know  there was a patio back there. Power washing sure makes a difference.
 Betsy (Gary's wife) and Elaine (Lou's wife) made up the beds and got the room ready for a volunteer to move in this week.
 Lou  got the fixtures for the blinds hung up. And all the other fixtures in the house that needed  to be put back on.
 Gary hung the blinds,
 Betsy cleaned them.
 Paul and Dave( another church member who helped all week) got the power washer going.
 Dave power washed the rest of the houses. The white spots on the wall is where I painted kilz on the brown water spots.
 By Tuesday Larry and some of the guys were across the street working on remodeling this house.
 Gary, Larry and Danny working on removing the walls and all of the cabinets in the kitchen.

 The wall between the two bedrooms was taken down, to make one large room
 They will remove this door and wall it in and the door on the right will be the door for the larger room.
Dave taking apart a cabinet in the laundry room.
 Gary feeling strong and mighty with the kitchen ripped out.
 Since they were having so much fun destroying that house they were told the flooring on the house we had just painted needed to have the flooring ripped out. First the rug, which we had carefully not gotten paint on, and then the linoleum.  Paul and Gary worked hard to remove it.


 Elaine giving the finishing touches to the kitchen in this house. It is ready for occupancy.
 The outside of the houses needed painted. Betsy painted around the window and along the top,
Dave rolled the wall and I painted the bottom and around fixtures. By the end of the day we had the houses painted except for the garage doors and the white panels on the back porches. Can't wait to see what we get done next week.