Saturday, February 7, 2015

MORE GETTING DONE

Sunday evening we gathered together to have chili and watch the Super Bowl.
Can Gene fit through that hole to put in the receptacle for the projector in the sanctuary?

Speakers taken down and two lights moved to the choir area.
One screen installed.
Rinda held me up on many ladders.
I used the scaffolding to put up the new ceiling tiles and insulation. I always liked climbing on monkey bars.
Butch putting back one of the heating duct vents.
Wes installing the last ceiling tile.
The University of Florida had donated this large heavy movie screen to the church. Thanks to Butch's block and tackle chain hoist we were able to get it to the ceiling and installed.
Larry and Wes figured out how to wire the screen and the switch lowers and raises the screen. We were so glad that it worked after all Larry did to get the screen installed.

Gene and Mary Ann getting ready to tile the bathroom floors.

Mary Ann measured and cut the tiles.
Gene installed them.
Mary Ann grouted and sealed the tiles.
While they tiled one bathroom Butch and Cheri framed in the doorways to the other one.
Cheri screwing on the dry wall.
Mary Ann painted the walls in the bathroom.
Cheri primed and painted the bead board for the lower bathroom walls.
She then installed the bead board. How flexible is she?
Paper towel dispenser, toilet paper holder and soap dispenser all had to be spray painted and then painted to match the bathroom walls.
Wes and Rinda hanging them in the bathrooms in the sanctuary.
The women's bathroom is finished.
Gene putting up the baby changing table in the men's room. That was a new one to  me.

Larry getting ready to frame in the new doorway to the church.

I scraped and painted the peak, with Rinda holding the ladder.
By the end of this week we have the peak painted and the entrance ready for the doors on Monday.

No comments:

Post a Comment